Recently Published
PTWL connectivity
Draft analysis of PTWL connectivity data
Park reserve size practical
This is a practical assignment on park reserve size using R and quatro.
SILO input data analysis
This report presents a preliminary analysis of the difference between two SILO gridded input sets to the ACT Source catchment model.